Gallery 2016

Roofing of the entrance, winter 2016/2017

15.12.2016

Water connection, sewerage, moving the main boiler, winter 2016

01.12.2016

Drainage, pit and subsoil preparation, autumn 2016

15.11.2016

Construction of a gas connection, summer 2016

15.08.2016